Maxon WL7 Instrucciones de operaciones Pagina 26

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 33
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 25
PATENTS PENDING 26
MANUAL PUMP OPERATION
LOADING & UNLOADING OCCUPANT
1. Reposition latches to
manually unfold the Lift
as follows. Raise latch
off anchor pin (FIG. 26-
1A) on LH side of Lift.
Position the standoff to
hold latch in place above
the anchor pin (FIG.
26-1B). Repeat for
latch on RH side of Lift.
LIFT - BACK VIEW
FIG. 26-1A
REPOSITIONED
LATCH & STANDOFF
FIG. 26-1B
LATCH
ANCHOR
PIN
STANDOFF
2. Remove the manual backup
handle from clips on the pump
cover (FIG. 26-2).
MANUAL BACKUP HANDLE
(LH PUMP SHOWN)
FIG. 26-2
PUMP
COVER
HANDLE
Vista de pagina 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 32 33

Comentarios a estos manuales

Sin comentarios